Saturday, 13 May 2017

Week 5: Cured and ready...

Just a week and a half after the concrete was poured, I was amazed at what the deliveries showed up in our land today.  Coming home after an overtime, I pass by the estate and these were the sights that I was given.  Our Service Officer did mention that frames will be up by next week but I thought deliveries will be next week in time for erecting the frames.
So happy to see the progress.

Deliveries for today ... that's a whole lot of timber frames

Deliveries for today ... that's a whole lot of timber frames sitting in our garage


Thanks future neighbour, we kindda used your land to put our roof trusses but it will be gone by Monday for sure

Thanks future neighbour, we kindda used your land to put our roof trusses but it will be gone by Monday for sure

A view from the bottom of the terrazza

I can just imagine us sitting in the terrazza watching the sunset from that mountain view

I can just imagine us sitting in the terrazza watching the sunset from that mountain view


Cant believe that our builder is just leaving some of their stuff in here ... hope they are still there by Monday


More update as it comes. Thanks for joining us today.
See you in the next post

Saturday, 6 May 2017

Another House Purchase


I made another small purchase for ThirtySeven today. 
This red drum pendant light will definitely compliment our red entrance door (that I mentioned in my previous post) .
This will be the first thing that you will see when you open the front door... for some reason MrK is not convinced that it will look nice, I guess he has to wait until we move and this gets put in.  I like it, I like it a lot.


 

I wanted to get more but I guess I have to wait until we move otherwise there  will be more to transfer to the new house.  Our monster 14kg washing machine was already here for a week now as the other one was nearing to its last breath so that's another thing that we need to bring to the new house.   Looking forward to new things that we will get but will do it slowly as MrK had to remind me lol.
Thanks for visiting us and see you in the next post.

Monday, 1 May 2017

Week 4: Slab it to me baby

Metal mesh down and laid, forms have been set... pouring of the slab will be happening soon...
More pics as soon as MrK visits the land again :)





Very happy that our builder Beechwood Homes and their slab inclusion which comes within the base price...
CONCRETE SLAB FEATURES •  Designed for an ‘S’, ‘M’ or ‘H’ classification to comply with AS2870 •  Concrete slab living area  floor level minimum is 300mm above ground level •  The edge beam of the slab is rebated to provide 3 courses of brickwork in lieu of normally used 2 courses, therefore eliminating the exposure of 150mm (6”) of concrete around the perimeter of your house •  The Beechwood concrete slab has no polystyrene infill panels built into it. It is a fully reinforced concrete slab foundation designed by a qualified structural engineer

One of the things that we noted with most of the builders around the estate (various builders not just a specific one) was the use of that white thingy or that polystyrene infill panels. We have learned that this type of construction may be fast and cheap in terms of building but poses a lot of risk in the integrity of the structure.  So overall we are very happy with the slab that our builder will be putting in there that will last for heaps of generation to come.

Thanks for dropping by and more updates as it comes.

02 May 2017

Today, the concrete slab was poured.... so the waiting game begins while the concrete cures...








Thursday, 27 April 2017

Construction Week 3: I'm All Fenced In, Plumbed and Electrically Charged :)

26 April 2017 (Wednesday)

We are now on week three and it seemed that things are moving along quite well...
As you can see, thirtyseven is all fenced in and form were build around the perimeter.  MrK spoke to one of the concreter and he said tomorrow the plumber will come in and install the pipes needed for the whole house.  Friday the metal mesh will be put in to have the land ready for pouring the cement for the slabs.... things are indeed moving along woohooo!






27 April 2017 (Thursday)

We have an electrical appointment today and on our way to that appointment, we passed by our land as we normally do and as promised the plumbers worked there today and they have installed the pipes to get it ready for the metal mesh to be put in tomorrow and slab pouring hopefully by Friday... full steam ahead.






We came out of our electrical appointment with South West after just an hour and a half (that was really fast) as MrK and I have already discussed what we needed for them to do.  Despite our best effort to just stick to what we consider essentials, we still walked out with a bill of $1800 ouch! Mind you, we did not asked them to install any downlights (we think $130 for EACH downlight is rather steep).  We are doing it after the handover.
We did asked them to put some provisions for the two front pillars for two up down lights which we will just ask our electrician to put in but it still costs us to have those put in.  There are certain things that would be hard for our electrician to do after the handover so we thought we will just turn a blind eye and pay them to do it.
This is not yet set in stone anyway.  We will still review them should we have a change of heart and hopefully there will be no need to add anymore except those downlights.


That's been what's happening today. Thanks for joining us in out journey and see you in the next post :)


Thursday, 20 April 2017

Construction: Week 2 - Poke a Hole (Piering)

Its a glorious day to do some piering ... upturn that land shall we :)

It was already getting dark when hubby returned back to the land to find more details ...


And these are what we have now ...

Piering to slab is now the stage that we are entering for this week... Because our land is just a stones throw away from our house, I am sure hubby will be there most of the time to see what action is happening.
Holes have been made on the land and all the holes have been filled with the cement slurry. This concrete piering will support the slab but as always hubby is raising concerns (hubby can react to things so prematurely as I'm sure these guys knows what they are doing)....  
He now wish to ask our service officer at Beechwood as to why some of these holes (pierings) does not have a full cement on them while others were at ground level... I guess another email for me is on the to do list tomorrow when I get to work :)
With a bit of luck, we might have a slab by the end of next week!

Thanks for joining and see you in the next post :)

Thursday, 13 April 2017

Construction: Week 1 - Cut and Fill


This week is officially the first week of the 27 weeks of the house build.
Nothing much happened since last week's cut and fill made to the land.  Meanwhile there's some action happening in our next door neighbour's construction as now they have erected some fencing between our two properties.

That's all for now and see you in our next post :)

Saturday, 8 April 2017

Of Light and Sink Talk

Now that construction is arms reach, I thought I'd do more mental notes for the house so I wont forget just in case I get bogged down and get more confused during the construction process.
Today. I decided to think about the external lights and this is what I am planning to get... yes I used the possessive word "I" as MrK said I can be in charge of those ...yipeee

I've chosen this up down lights. Minimalist yet stylish and definitely functional. Something like this.

Related image
I am thinking of this simple up down light.  Nothing flashy but functional.

Glad to have found this at Bunnings:



An issue that I raised with Beechwood this week was the configuration of our sink.
After visiting a friend who just moved in into their lovely new home, I happen to admire her sink.  Just like her, we have a stone benchtop (which was an upgrade on our part). 
She asked me how ours will be like. 
I said something like this:
Image result for double bowl kitchen sink
Image result for undermount sink
But she convinced me to ask if we can have something like hers (wasn't able to take a photo) similar to this:
I tried contacting BWH stating that this was not discussed to us during the colour selection appointment when we spoke of other things.  But unfortunately because we were apparently in the construction stage, any variations will cost us $1000.  Needless to say, we dropped the idea.

It would have been nice to have a benchtop without a stainless steel sticking up but never mind.
So whoever is reading this and you are still in the planning stage, just perhaps discuss this option if you like.

Anyway, that's it for now. Thanks for joining us in our journey and see you in our next post.

Wednesday, 5 April 2017

Countdown begins...

We can't wait for 10 April to arrive.  The K family is really counting the days 'till we see any movement in our little patch of what we will call home soon.
Imagine our surprise today. 
Any work on our land is suppose to commenced on Monday 10 April 2017...but look at what we found today after an impromptu visit to our land after I arrived from work .
Ijust wanted to take photos before work starts but we found our land has already been benched.
Or perhaps BWH is taking advantage of the good weather and did some work after so many days of rain... thanks #beechwoodhomes for being so efficient.

Bare land no more ... work has truly started and we couldn't be happier


 
the kids weren't even supposed to get out of the car as we were thinking this will be a five minute visit ... the kids in their pajamas and trying to share the joy with us

 
Someone was sneaky peeky ... And have you seen an antique porta loo --- where here it is...but I am not complaining because once you see a porta loo in your site, that means work is imminent.

We will try to see and get a glimpse again on Monday and see what they have started.  For the meantime, we are calling our electrician and will make an appointment for our electrical wirings for the house.

Thanks for joining us in our journey and see you in the next post.